MySQL Change Review and Execution Plan Development
Review MySQL changes (DDL, data migration, parameter adjustment, archiving) for feasibility, risks, execution methods, and rollback plans, and produce an executable change plan with rollback and verification.
Editor's Note
Provide the table's DDL and row count, or a change ticket for accurate assessment. For large tables (>10 million rows or >10 GB), use gh-ost or pt-osc tools and schedule during low-traffic periods. Ensure rollback steps are included for all changes, especially for irreversible operations like column deletion.
When to Use It
- Review ALTER table structure changes (e.g., adding indexes, changing column types)
- Evaluate the execution methods and batch strategies for data correction SQL
- Develop the execution order and rollback plan for parameter changes
- Analyze tool selection and space requirements for large table changes
SKILL.md
SkillsHunter provides this listing for informational purposes only. Review the skill’s source, license, and required permissions before use. You are responsible for deciding whether to install or run it. Terms of Use
变更评审
目标:把一句 ALTER TABLE ... 变成能睡着觉上线的变更方案。评审不通过的,明确给"不通过 + 缺什么信息 + 怎么改能过"。
判读依据:指标阈值基准 红线与分级:安全红线与执行分级 索引设计口径:索引设计手册 工具选型:在线 DDL 工具选型 输出格式:变更方案模板
输入识别
| 用户给什么 | 做什么 |
|---|---|
一条 ALTER |
走完整评审(7 步) |
| 一批 DDL(发版脚本、Flyway/Liquibase 迁移文件) | 逐条评审 + 给合并/排序建议(同表多个 ALTER 合并成一次,避免多轮全表重建) |
数据订正 SQL(UPDATE/DELETE 带条件) |
重点走"大事务与分批"路径 |
| 参数变更 | 走"参数变更"专用路径(动态 vs 需重启、主从顺序、回退) |
| 归档/清理方案 | 重点走空间回收与删除节奏 |
| 只有"想加个字段"的想法 | 先补信息采集清单 |
| 已写好的变更单 | 做合规检查(逐项打勾,找缺失项),不是重写 |
评审 7 步
1. 变更分类与风险起点
先定基线风险,决定后续严格程度:
| 类别 | 默认风险 | 说明 |
|---|---|---|
| 加二级索引 | 中 | 多数可 INPLACE,占空间 + IO |
| 加列(非末尾/带默认值) | 中—高 | 8.0 INSTANT 有条件;5.7 全表重建 |
| 改列类型 / 字符集 / 收窄长度 | 高 | 通常 COPY 全表重建,且可能截断数据 |
| 删列 / 改名 | 高(常不可逆) | 应用回滚困难 |
| 加/删主键 | 高 | 复制、恢复、订正能力受影响 |
分区改造 / OPTIMIZE / 表重建 |
高 | 空间峰值需 2 倍余量 |
| 数据订正(DML) | 中—高 | 大事务 → undo、复制延迟、回滚耗时 |
| 参数变更 | 视参数 | 分动态/重启,分主从顺序 |
| 数据库/表删除 | 极高(L3) | 必须有备份可用性与演练证据 |
2. 可行性与执行方式判定(最关键)
按 在线 DDL 工具选型 判定:
- 能否
ALGORITHM=INSTANT(8.0.12+ 加列到末尾等;注意:INSTANT 后表可能有行格式碎片,多次 INSTANT 累积影响后续 DDL) - 能否
ALGORITHM=INPLACE, LOCK=NONE(加索引、部分改类型) - 只能
COPY(改主键、部分改类型、5.7 某些场景)→ 大表必须走 gh-ost / pt-osc - 判定口径:
表行数 × 行大小与变更方式共同决定耗时。默认阈值:预计执行 > 30 min 或表 > 1000 万行 / > 10 GB,一律按"需影子表工具 + 变更窗口 + 值班陪同"处理。 - 明确给出耗时估算公式与代入过程,不要只写"预计 1 小时"。
3. 空间与 IO 影响
- 新索引/新表体积估算;是否需要 2 倍临时空间(COPY 类、
OPTIMIZE)。 - 当前磁盘余量是否满足(磁盘 < 变更所需峰值空间 = 直接不通过,这是最常见的翻车点)。
- 变更期间 IO 抬升对同机其他实例的影响;云 RDS 是否触发 IO 突发额度耗尽。
- binlog 产出量(RBR 下大表重建可能产生几十 GB binlog → 影响从库延迟与下游同步、磁盘)。
4. 复制与下游影响
- 从库延迟预计(主库执行完才开始回放,从库延迟 ≈ 主库执行耗时是通用近似)。
- 是否有 DTS/Canal/Kafka/数仓订阅:改列名/类型/删列会打断链路(必须提前通知并在下游验证)。
binlog_format=ROW+binlog_row_image=FULL下大表变更的 binlog 放大。- 多从库/级联复制的传播时间。
5. 业务影响与窗口
- 元数据锁(MDL)风险:变更开始与结束瞬间需要拿 MDL 写锁,若此时有长查询/未提交事务会阻塞并引发连锁排队。→ 前置检查必含"当前无 > N 秒的事务/查询"。
- 是否需要停写?停多久?读写分离流量如何摘?
- 建议窗口:业务低谷 + 避开批处理/结算/备份任务 + 避开周五与发布日。
- 应用侧兼容性:新代码读旧表结构 / 旧代码读新表结构(必须支持双向兼容,这是回滚可行的前提)。
6. 回滚方案(评审一票否决项)
按可行性分级:
- 可回滚:加索引(
DROP INDEX,INPLACE 快)、加可空列(保留不删即可)。 - 部分回滚:改类型(需重建回去,耗时同量级)、数据订正(需备份原值)。
- 不可逆:删列、收窄类型导致截断、
DROP TABLE。→ 必须给补偿设计:- 采用两阶段:先加新列双写 → 迁数据 → 校验 → 切读 → 观察一个周期 → 再删旧列;
- 删除类变更延后一个版本执行,本期只停用不删除。
- 数据订正必须"先 SELECT 出将被改的行并存入影子表",回滚即从影子表恢复。
7. 输出方案
按 变更方案模板 产出,必含:前置检查清单(带命令)、执行步骤(分步可中断 + 每步观测点与判停标准)、回滚步骤、验证方法、应急联系人、时间预算、失败处理决策树("跑到一半很慢怎么办"——多数方案缺这一节,恰恰最容易出事)。
一票否决清单(任一项即"不通过")
- ❌ 无回滚方案,或回滚方式与影响面不匹配
- ❌ 未提供表行数/数据量(无法评估耗时与空间)
- ❌ 磁盘余量不足峰值需求
- ❌ 长事务防护缺失(未设
lock_wait_timeout、无 kill 长查询前置步骤) - ❌ 大表(> 1000 万行)用 COPY 方式在主库直接执行
- ❌ 无 binlog/下游同步链路影响评估(有订阅时)
- ❌ 变更窗口在业务高峰或周五/发布日且无理由说明
- ❌ 删列/删表类变更未采用两阶段(本期删除)
- ❌ 未在从库或影子表做过一次演练
大事务/数据订正专项规则
UPDATE/DELETE 满足任一即必须分批:影响行数 > 10 万、预计耗时 > 5 min、从库会因此延迟 > 30s、undo 空间增长可观。
分批模板:
-- 循环执行直到 affected rows = 0,每批之间 sleep 0.2–0.5s 观察复制延迟
DELETE FROM <tbl> WHERE <cond> AND id BETWEEN :a AND :b LIMIT 2000;
并给出:批次大小依据、进度可观测方式(记录已处理最大 id)、中断是否安全(幂等条件)、预计总时长。
参数变更专项路径
必须说明:当前值 → 目标值 → 依据(哪个指标)→ 动态生效还是需重启 → 从库先改还是主库先改(通常先从库,验证后再主库,且需重启的参数要评估滚动重启顺序)→ 是否写入配置文件/SET PERSIST(防止重启回退)→ 回滚命令 → 观察指标与判停标准。
云 RDS:需在参数模板下发,注意"可修改参数"范围与"是否重启"标记。
边界
- 只做方案与评审,不替用户执行变更。
- 不因为"INPLACE 不会锁表"就忽略 MDL 与从库延迟——这两点必须在方案里量化。
- 用户催"直接告诉我能不能执行"时,先给结论(通过/有条件通过/不通过)再给依据,但有条件通过必须列明条件。
If Connectors Available
If 数据库 已连接(只读账号):
- 自动采集表行数、数据/索引体积、磁盘余量、当前长事务,评审结论直接带实测值。
If 文档平台 已连接:
- 变更方案自动发布为文档并挂审批流,评审意见沉淀在同一文档内。
If 任务工具 已连接:
- 按方案步骤生成上线 checklist 待办;变更后 24h 的"回退临时措施"提醒自动排期。
If 沟通工具 已连接:
- 变更开始/结束/异常自动播报到群,值班期间进度可视。
If 无连接器(默认):
- 输出变更方案到
outputs/change-plan-<表名>-<YYYYMMDD>.md,前置检查命令供复制执行。
View original Markdown
---
name: mysql-change-review
version: 1.0.0
description: Review a MySQL change plan (DDL, data migration, parameter tuning, archiving) — assess online-DDL feasibility, locking and space cost, pick gh-ost/pt-osc/native INPLACE, and produce a step-by-step executable plan with rollback and verification.
name_en: Change Review
name_zh: 变更评审
description_en: Review DDL / data migration / parameter / archiving changes: feasibility, lock and space cost, tool choice, executable plan with rollback and verification.
description_zh: 评审 MySQL 变更(DDL、数据迁移、参数调整、数据归档):在线能力与锁影响、空间与耗时估算、原生 INPLACE / gh-ost / pt-osc 选型,输出可执行变更方案(含回滚与验证)。
user-invocable: true
argument-hint: 贴变更 SQL(如 ALTER 语句)+ 表结构与行数,或贴变更单
argument-hint-en: Paste the change SQL (e.g. ALTER) with table DDL and row count, or the change ticket
argument-hint-zh: 贴变更 SQL(如 ALTER 语句)+ 表结构与行数,或贴变更单
---
# 变更评审
目标:把一句 `ALTER TABLE ...` 变成**能睡着觉上线的变更方案**。评审不通过的,明确给"不通过 + 缺什么信息 + 怎么改能过"。
判读依据:[指标阈值基准](../mysql-ops-knowledge/references/metrics-thresholds.md)
红线与分级:[安全红线与执行分级](../mysql-ops-knowledge/references/safe-execution-rules.md)
索引设计口径:[索引设计手册](../mysql-sql-doctor/references/index-playbook.md)
工具选型:[在线 DDL 工具选型](references/online-ddl-tooling.md)
输出格式:[变更方案模板](references/change-plan-template.md)
## 输入识别
| 用户给什么 | 做什么 |
|:---|:---|
| 一条 `ALTER` | 走完整评审(7 步) |
| 一批 DDL(发版脚本、Flyway/Liquibase 迁移文件) | 逐条评审 + 给**合并/排序建议**(同表多个 ALTER 合并成一次,避免多轮全表重建) |
| 数据订正 SQL(`UPDATE`/`DELETE` 带条件) | 重点走"大事务与分批"路径 |
| 参数变更 | 走"参数变更"专用路径(动态 vs 需重启、主从顺序、回退) |
| 归档/清理方案 | 重点走空间回收与删除节奏 |
| 只有"想加个字段"的想法 | 先补信息采集清单 |
| 已写好的变更单 | 做**合规检查**(逐项打勾,找缺失项),不是重写 |
## 评审 7 步
### 1. 变更分类与风险起点
先定基线风险,决定后续严格程度:
| 类别 | 默认风险 | 说明 |
|:---|:---|:---|
| 加二级索引 | 中 | 多数可 `INPLACE`,占空间 + IO |
| 加列(非末尾/带默认值) | 中—高 | 8.0 `INSTANT` 有条件;5.7 全表重建 |
| 改列类型 / 字符集 / 收窄长度 | **高** | 通常 COPY 全表重建,且可能截断数据 |
| 删列 / 改名 | 高(**常不可逆**) | 应用回滚困难 |
| 加/删主键 | **高** | 复制、恢复、订正能力受影响 |
| 分区改造 / `OPTIMIZE` / 表重建 | 高 | 空间峰值需 2 倍余量 |
| 数据订正(DML) | 中—高 | 大事务 → undo、复制延迟、回滚耗时 |
| 参数变更 | 视参数 | 分动态/重启,分主从顺序 |
| 数据库/表删除 | **极高(L3)** | 必须有备份可用性与演练证据 |
### 2. 可行性与执行方式判定(最关键)
按 [在线 DDL 工具选型](references/online-ddl-tooling.md) 判定:
- 能否 `ALGORITHM=INSTANT`(8.0.12+ 加列到末尾等;**注意:INSTANT 后表可能有行格式碎片,多次 INSTANT 累积影响后续 DDL**)
- 能否 `ALGORITHM=INPLACE, LOCK=NONE`(加索引、部分改类型)
- 只能 `COPY`(改主键、部分改类型、5.7 某些场景)→ **大表必须走 gh-ost / pt-osc**
- 判定口径:`表行数 × 行大小` 与**变更方式**共同决定耗时。**默认阈值:预计执行 > 30 min 或表 > 1000 万行 / > 10 GB,一律按"需影子表工具 + 变更窗口 + 值班陪同"处理。**
- 明确给出耗时估算公式与代入过程,不要只写"预计 1 小时"。
### 3. 空间与 IO 影响
- 新索引/新表体积估算;是否需要 2 倍临时空间(COPY 类、`OPTIMIZE`)。
- 当前磁盘余量是否满足(**磁盘 < 变更所需峰值空间 = 直接不通过**,这是最常见的翻车点)。
- 变更期间 IO 抬升对同机其他实例的影响;云 RDS 是否触发 IO 突发额度耗尽。
- binlog 产出量(RBR 下大表重建可能产生几十 GB binlog → 影响从库延迟与下游同步、磁盘)。
### 4. 复制与下游影响
- 从库延迟预计(主库执行完才开始回放,**从库延迟 ≈ 主库执行耗时**是通用近似)。
- 是否有 DTS/Canal/Kafka/数仓订阅:改列名/类型/删列会打断链路(必须提前通知并在下游验证)。
- `binlog_format=ROW` + `binlog_row_image=FULL` 下大表变更的 binlog 放大。
- 多从库/级联复制的传播时间。
### 5. 业务影响与窗口
- 元数据锁(MDL)风险:**变更开始与结束瞬间需要拿 MDL 写锁**,若此时有长查询/未提交事务会阻塞并引发连锁排队。→ 前置检查必含"当前无 > N 秒的事务/查询"。
- 是否需要停写?停多久?读写分离流量如何摘?
- 建议窗口:**业务低谷 + 避开批处理/结算/备份任务 + 避开周五与发布日**。
- 应用侧兼容性:新代码读旧表结构 / 旧代码读新表结构(**必须支持双向兼容**,这是回滚可行的前提)。
### 6. 回滚方案(评审一票否决项)
按可行性分级:
- **可回滚**:加索引(`DROP INDEX`,INPLACE 快)、加可空列(保留不删即可)。
- **部分回滚**:改类型(需重建回去,耗时同量级)、数据订正(需备份原值)。
- **不可逆**:删列、收窄类型导致截断、`DROP TABLE`。→ **必须给补偿设计**:
- 采用**两阶段**:先加新列双写 → 迁数据 → 校验 → 切读 → 观察一个周期 → 再删旧列;
- 删除类变更延后一个版本执行,本期只停用不删除。
- 数据订正必须"**先 SELECT 出将被改的行并存入影子表**",回滚即从影子表恢复。
### 7. 输出方案
按 [变更方案模板](references/change-plan-template.md) 产出,必含:前置检查清单(带命令)、执行步骤(分步可中断 + 每步观测点与判停标准)、回滚步骤、验证方法、应急联系人、时间预算、失败处理决策树("跑到一半很慢怎么办"——多数方案缺这一节,恰恰最容易出事)。
## 一票否决清单(任一项即"不通过")
- ❌ 无回滚方案,或回滚方式与影响面不匹配
- ❌ 未提供表行数/数据量(无法评估耗时与空间)
- ❌ 磁盘余量不足峰值需求
- ❌ 长事务防护缺失(未设 `lock_wait_timeout`、无 kill 长查询前置步骤)
- ❌ 大表(> 1000 万行)用 COPY 方式在主库直接执行
- ❌ 无 binlog/下游同步链路影响评估(有订阅时)
- ❌ 变更窗口在业务高峰或周五/发布日且无理由说明
- ❌ 删列/删表类变更未采用两阶段(本期删除)
- ❌ 未在从库或影子表做过一次演练
## 大事务/数据订正专项规则
`UPDATE`/`DELETE` 满足任一即必须分批:影响行数 > 10 万、预计耗时 > 5 min、从库会因此延迟 > 30s、undo 空间增长可观。
分批模板:
```sql
-- 循环执行直到 affected rows = 0,每批之间 sleep 0.2–0.5s 观察复制延迟
DELETE FROM <tbl> WHERE <cond> AND id BETWEEN :a AND :b LIMIT 2000;
```
并给出:批次大小依据、进度可观测方式(记录已处理最大 id)、中断是否安全(幂等条件)、预计总时长。
## 参数变更专项路径
必须说明:当前值 → 目标值 → 依据(哪个指标)→ 动态生效还是需重启 → 从库先改还是主库先改(**通常先从库,验证后再主库,且需重启的参数要评估滚动重启顺序**)→ 是否写入配置文件/`SET PERSIST`(防止重启回退)→ 回滚命令 → 观察指标与判停标准。
云 RDS:需在参数模板下发,注意"可修改参数"范围与"是否重启"标记。
## 边界
- 只做方案与评审,不替用户执行变更。
- 不因为"INPLACE 不会锁表"就忽略 MDL 与从库延迟——这两点必须在方案里量化。
- 用户催"直接告诉我能不能执行"时,先给结论(通过/有条件通过/不通过)再给依据,但**有条件通过必须列明条件**。
## If Connectors Available
If **数据库** 已连接(只读账号):
- 自动采集表行数、数据/索引体积、磁盘余量、当前长事务,评审结论直接带实测值。
If **文档平台** 已连接:
- 变更方案自动发布为文档并挂审批流,评审意见沉淀在同一文档内。
If **任务工具** 已连接:
- 按方案步骤生成上线 checklist 待办;变更后 24h 的"回退临时措施"提醒自动排期。
If **沟通工具** 已连接:
- 变更开始/结束/异常自动播报到群,值班期间进度可视。
If 无连接器(默认):
- 输出变更方案到 `outputs/change-plan-<表名>-<YYYYMMDD>.md`,前置检查命令供复制执行。