Overview: Before running, ensure `qa.level` is set appropriately. At `qa.level: minimal`, the regression suite is not generated — report 'Regression suite not generated at qa.level minimal' and stop. Confirm with the user before creating or updating the manifest.
Overview: Ensure the story files exist before running the plan. If a story file is missing, it will be noted as 'MISSING' and the plan will continue with the remaining stories. The `Type:` field in a story must be explicitly declared before implementation begins; if it is missing, the type will be inferred from the acceptance criteria and flagged as a gap.
Overview: Before running, ensure that the required inputs such as profiler output, test results, and performance budgets are present. If any required input is absent, the report will state 'NOT ASSESSED — NO DATA' and specify which inputs were missing.
Overview: Check for the presence of required inputs such as milestone definitions in `production/milestones/` and sprint reports in `production/sprints/` before proceeding. If any required input is absent, the review will be marked as `NOT ASSESSED — NO DATA`.
Overview: Before running, ensure the game concept document (`design/gdd/game-concept.md`) exists. If not, run `/brainstorm` first to create it. The system list, dependency mapping, and priority sorting are handled as separate steps in collaborative mode.
Overview: Before running the localization pipeline, ensure the code root is resolved as described in `.claude/docs/code-root-resolution.md`. The user must confirm writing new string entries to `assets/data/strings/strings-en.json` during the extract phase.
Overview: Before generating the checklist, ensure that the project configuration file (`project.yaml`) is present and contains the necessary details about the project's rigor, workflow, stage, and automation mode. If the configuration is missing, the checklist will mark items as 'NOT ASSESSED — platform/stage unknown'.
Overview: Before implementing a hotfix, ensure the bug is assessed as S1 or S2. Confirm the base reference for the hotfix branch, and obtain approvals from lead-programmer, qa-tester, and producer before proceeding.
Overview: Before using this skill, ensure that the /next-step skill is available and properly configured. The user must provide any optional arguments related to the task they just completed, such as 'finished design-review' or 'stuck on ADRs'.
Overview: Before estimating, read CLAUDE.md for project context and use Grep to scan affected code for size and branching metrics. The recommended budget should be the expected estimate, not the optimistic one.
Overview: Verify that the project is in the 'Release' or 'Polish' stage and that a gold master build has passed a release gate. Confirm this by checking `project.yaml` and the most recent file in `production/gate-checks/` before proceeding.