Overview: Before starting, ensure the season or event name is provided. The pipeline will resolve configuration settings, including team size and automation mode, which affect which agents are spawned and how decisions are made.
Overview: Before starting, specify the level or area to design (e.g., 'forest temple', 'tutorial village', 'final boss arena'). The art-director's visual targets from Step 1 must be passed to the level-designer in Step 2 as explicit constraints.
Overview: Before starting, ensure the combat feature description is provided. The pipeline will resolve configuration settings such as review mode, automation, team size, and workflow. The `review` argument overrides the default review mode. The `workflow` setting determines the depth of the design document generated during Phase 1.
Overview: Before starting, verify that the feature or area to design audio for is specified. The `team.size` configuration determines which agents are spawned: `individual` (sound-designer only), `small` (audio-director, technical-artist, gameplay-programmer), or `studio` (accessibility-specialist and primary engine specialist).
Overview: Before generating a new sprint plan, ensure that the required stories exist under `production/epics/` and that the sprint goal can be demonstrated by the end of the sprint. If no QA plan exists, this must be explicitly surfaced.
Overview: Before starting the soak test, ensure the game is launched from a fresh session, all background applications are closed, and the appropriate performance monitoring tool is open and recording. Confirm the soak target and prior known issues to watch for.
Overview: Before running the improvement loop, ensure the skill file `.claude/skills/[name]/SKILL.md` exists and is readable. If the skill has a `references/` folder, fixes to phase steps should be made in the corresponding `references/` files, not in `SKILL.md` itself. The user must decide whether to keep or revert changes based on the combined score after retesting.
Overview: Before running the audit, ensure that `project.yaml` is configured with `engine.name`, `engine.language`, `platform.multiplayer`, and `platform.online` values. If these are missing, the audit will mark relevant categories as 'NOT ASSESSED'.
Overview: Before applying the scope change percentage, ensure the original plan document is found and readable. If the document is missing, stop the process and report the missing file. Read the GDD by section using the Grep tool (pattern `^#`, content mode) and read those ranges with offset and limit.
Overview: Check for the existence of `production/sprint-status.yaml` and the appropriate sprint or milestone plan before proceeding. If any required input is absent, the report will be marked as `NOT ASSESSED — NO DATA`.
Overview: If no test output or CI logs are found, explicitly state 'Test results: NOT ASSESSED — no test output or CI logs found' rather than omitting the line. Ensure that the checklist only includes the block matching `platform.cert_tier` and does not emit other certification blocks even if the platform argument is 'all'.